1300 916 400  ·  ops@riverstonelogistics.com.au
Riverstone Logistics logo Riverstone Logistics Power Division · Generator Hire
Power Division – Engineered Experience

Generator hire from Tea Gardens, delivered, installed and commissioned.

Riverstone Logistics Power Division hires Denyo and Airman diesel generators from 20 kVA to 1250 kVA, and the GEH2 100 kVA hydrogen generator. Every set is delivered, installed, commissioned and maintained. Warranty and tech support available.

We deliver anywhere within 100 km by road of Tea Gardens. Power Division is response ready.

20–1250 kVADenyo & Airman diesel
100 kVAGEH2 hydrogen
100 kmby road from Tea Gardens
Response readyBookings 5am–10pm
Generator range

Diesel and hydrogen generators, 20 to 1250 kVA

Power Division hires to anyone who needs a generator delivered within 100 km by road of Tea Gardens. The diesel range runs from 20 kVA for a lighter load up to 1250 kVA for a large site. kVA is the generator's rated output.

Denyo and Airman diesel sets

Diesel generators from 20 kVA to 1250 kVA, plus the distribution gear to go with them. Tell us what you need to run and we will match the set.

GEH2 hydrogen generator

The GEH2 is a 100 kVA hydrogen fuel-cell generator, part of the Power Division hire range. It suits sites that would rather not run diesel.

Renewable options

Renewable power options are also available through Power Division. Ask about them when you call for a quote.

Full service

Delivered, installed, commissioned and maintained

Every Power Division hire is delivered to your site, installed, commissioned and maintained. Warranty and tech support available.

Tell us what the generator needs to run and where it will sit, and we will match the set and the distribution gear to the job.

Bookings 5am to 10pm

Response ready

Power Division is response ready. Bookings are taken 5am to 10pm. Call 1300 916 400.

Delivery area

Delivered within 100 km by road of Tea Gardens

We deliver generators anywhere within 100 km by road of Tea Gardens. Each set comes to your site from our base at 4/19 Wanya Rd, Tea Gardens.

That takes in Hawks Nest, Karuah, Bulahdelah, Stroud, Medowie, Raymond Terrace, Williamtown, Nelson Bay and Newcastle, each under 100 km by road from our base.

Planning the drop-off

Tell us about the site

Some sites around the Myall Lakes and Port Stephens are a long drive even when they look close on a map. Nelson Bay, for example, sits just across the water from Tea Gardens but is a much longer trip by road.

Mention access, ground conditions and where the generator needs to sit when you call, so delivery and installation can be planned properly.

How to hire

From the first call to commissioning

The steps are the same for a 20 kVA set or a 1250 kVA set. Power Division is response ready. Bookings are taken 5am to 10pm.

1

Call for a quote

Call 1300 916 400 and describe the job: where, what it needs to run, and for how long.

2

Set and price confirmed

We match a set from the Denyo and Airman diesel range or the GEH2 hydrogen generator, check availability and give you a price before anything is booked.

3

Delivered, installed and commissioned

Delivered to your site anywhere within 100 km by road of Tea Gardens, installed, commissioned and maintained. Warranty and tech support available.

Common questions

Frequently asked questions

Do you hire generators in Tea Gardens?
Yes. Riverstone Logistics Power Division hires diesel and hydrogen generators from its base at 4/19 Wanya Rd, Tea Gardens NSW.
What sizes and brands are available?
Denyo and Airman diesel generators from 20 kVA to 1250 kVA, and the GEH2 100 kVA hydrogen generator. If you are unsure of the size, tell us what the generator needs to run and we will match the set.
Do you install and commission the generator?
Yes. Every hire is delivered, installed, commissioned and maintained. Warranty and tech support available.
Do you hire hydrogen generators?
Yes. The GEH2 is a 100 kVA hydrogen fuel-cell generator in the Power Division hire range, for sites that would rather not run diesel.
Do you have renewable options?
Yes. Renewable power options are available through Power Division. Ask about them when you call for a quote.
Where do you deliver?
Anywhere within 100 km by road of Tea Gardens. That includes Hawks Nest, Karuah, Bulahdelah, Stroud, Medowie, Raymond Terrace, Williamtown, Nelson Bay and Newcastle, each under 100 km by road from our base.
Do you deliver to Port Stephens?
Yes. Medowie, Raymond Terrace, Williamtown and Nelson Bay are all within 100 km by road of Tea Gardens.
How much does it cost?
Every hire is quoted by phone on 1300 916 400. Price depends on the generator, the delivery and the length of hire.
How do I book?
Call 1300 916 400 for a quote. You can also email ops@riverstonelogistics.com.au; include a phone number and we will call you back.
In short

Power Division at a glance

Riverstone Logistics Power Division hires Denyo and Airman diesel generators from 20 kVA to 1250 kVA and the GEH2 100 kVA hydrogen generator from its base at 4/19 Wanya Rd, Tea Gardens NSW 2324. Generators are delivered anywhere within 100 km by road of Tea Gardens, installed, commissioned and maintained. Warranty and tech support available. Power Division is response ready. Bookings are taken 5am to 10pm. Every hire is quoted by phone on 1300 916 400, or by email at ops@riverstonelogistics.com.au.

Get a quote

Call first for a quote

Tell us where the generator is going, what it needs to run and for how long. We will confirm the set, delivery, installation and price.

📞 Call 1300 916 400 ✉ Email ops@riverstonelogistics.com.au

If you email first, include a phone number and we will call you back to quote.

Get a quote Call now